Thats exactly my point.
And this is my work computer FYI.... which is why I ended up with inteljunk. All I could do (this time around) was give a list of requirements and let them pick the hardware to meet it. One of those requirements was hardware virtualization -- and of course when it came in, it didn't, which was a shock to the guy they had actually built the thing (understandably). Because of this, next time around I get to give precise and detailed specs... and a bigger budget.
I don't think that the hardware guy is going to last much longer... the server fiasco was almost enough to put an instant end to dealings with him.... an asus gamer-type mainboard with a phenom chip (not even a "corp stable" board...), a "hardware raid" card that was actually FAKERAID-sata, a backplane that supported sata only and connected via delicate sata plugs (rather than a proper sas backplane with SFF-8087 plug) when the price was *identical*, and a bunch of consumer-grade sata disks (for a DATABASE HOST!!!) -- and this is for THE machine that this company DEPENDS on.... no farm here with multiple redundant servers. I had a few changes made, naturally... like the whole thing went back to drawing board.




Reply With Quote
