Well lets put it this way, I design boats as well as my computing life, manufacturing wise that is simple as it takes typically less then 4 hours to assemble a boat but to gain that extra 5 mph out of the hull it took 18 months of analysis, design and simulations to find that "sweet spot spec" that allowed that performance difference. Assembly wise it made no difference. I guess it all depends on the product being designed. Ask any farmer as well about what they would do about their combine if they had a chance to talk to the engineer.![]()



Reply With Quote
